4/23/13: Counter top and faucet replaced. Remaining: wallpaper, light fixture, and mirror to be replaced, cabinets to be refinished, wallpaper to be replaced by paint. |
Wednesday, April 24, 2013
Downstairs Half Bathroom
Tuesday, April 23, 2013
Upstairs Hall Bathroom
Old photo showing counter top, mirror, wallpaper. |
4/22/13: Counter top replaced with granite. Still to do: Replace wallpaper with paint, mirror, light fixture, and faucet, and refinish cabinets. Tile is good and will remain. |
Monday, April 22, 2013
Dining Room
BEFORE: pink curtains that are dated and shredding |
BEFORE: wallpaper we like, but it is peeling |
Wallpaper has been stripped, curtains removed, and primer coat applied |
5/01/13 Walls painted, curtains borrowed from the girls' bedroom until we buy new curtains. To do: trim will be repainted, floors refinished, chandelier replaced. |
Friday, April 19, 2013
Thursday, April 18, 2013
Master Bath Remodel
Master Bath Before
Demolition Day 1
Marble floor going in.
Marble floor complete (not yet grouted)
Master shower: demolition
Master shower: rebuilding the base
Master shower: Concrete board complete
Marble brick pattern on walls going in.
Steady progress
Shampoo/soap niche
4/19/13 |
4/19/13 |
4/20/13 |
Wallpaper stripped and primer coat applied
5/4/13: New granite counter tops, light fixtures, hardware, and mirrors. |
5/4/13: Remaining to do: Install glass shower doors (using a shower curtain for now) |
5/4/13 |
5/4/13: Cabinets refinished, marble floor laid. Remaining to do: install new drawer pulls. |
5/4/13: New marble floor |
Wednesday, April 17, 2013
Kitchen Floor: Removal of linoleum floor and installation of ceramic tile
Kitchen before: linoleum floor
Pallet of tiles awaiting installation
And so it begins
End of the first day (half day)
Second day, almost complete
End of second day.
Day three is grouting day
Grouting complete